Adaptive reuse, decided with open eyes.

We help heads of school, boards, and CFOs decide whether an existing building can become the school — and then deliver it. Every story below follows the same sequence: the decision, the before, the design, the result.

Hiba Academy Bay Area Hiba Academy Bay Area

The greenest building is the one that already exists.

90%

of construction and demolition debris in the U.S. comes from demolition, not from new construction.

50–75%

less embodied carbon in renovation and reuse than in new construction.

42%

of global CO₂ emissions come from the built environment.

10–80yrs

for a new energy-efficient building to offset the climate impact of its own construction.

~1,800 tons
CO₂ avoided across Hiba Academy Bay Area & International School of San Francisco vs. building new — estimate, full analysis in progress
01

Reuse or build new: three lenses

The same program, the same site, compared on what a board actually weighs.

Schedule

First to open

Reuse is usually first to open: a cleaner environmental path and construction inside a known shell. The risk is concentrated in what the building hides.

Read the analysis →
Cost

Lower, with a wider band

When the shell is sound, reuse typically runs ~10–25% below equivalent new construction, with a higher contingency for the unknowns.

Read the analysis →
Carbon

Decisive on embodied carbon

Reuse typically avoids ~50–75% of embodied carbon. New construction can pull ahead on long-run operating efficiency.

Read the analysis →
02

Our method

The same four steps run through every project, small or large.

01

Assess

We evaluate existing conditions, structure, systems, code, seismic, and accessibility — and the planning path — so risk is understood up front.

02

Envision

We translate your program and mission into design options that balance aesthetics, performance, budget, and schedule.

03

Permit

Deep familiarity with local planning, zoning, historic review, and building departments lets us anticipate approvals and keep the schedule intact.

04

Transform

We carry the design vision through construction, protecting intent, budget, and timeline to delivery.

03

Stories from real campuses

Hiba Academy Bay Area
Story 01 · Change of occupancyB → E

Hiba Academy Bay Area

A 60,000 SF change-of-occupancy conversion — the definitive proof of feasibility and code mastery.

Size60,000 SF
Schedule00 mo
Carbon00%
International School of San Francisco
Story 02 · Phased live campusRenovation

International School of San Francisco

New HVAC, kitchen and MPR, HS wellness center and science suites — delivered in phases on a live campus.

Size180,000 SF
MPR300 people
Phases00
FAIS Dennis Gallagher Arts Pavilion
Story 03 · Garage to arts pavilionAdaptive reuse

FAIS — Dennis Gallagher Arts Pavilion

An existing garage converted into a fine arts pavilion with a black box theater, recital and recording studios.

Size20,000 SF
Prior useGarage
CertificationLEED
White paper

Reuse or Build New?

How to weigh adaptive reuse against new construction for a San Francisco school: schedule, cost, and carbon, side by side.

Read the white paper

Considering a building for your school?

A short conversation, or an early feasibility look, can save months and surprises later.

Start a conversation